CF004A

Image is for reference,
please contact us to get the real picture

Part No :

CF004A

Manufacturer
Richco, Inc. (Essentra Components)
Description
HOSE .542" ID HDPE 328' GRAY
Catalog
Protective Hoses, Solid Tubing, Sleeving
DataSheet
CF004A PDF
Availability
2 pieces
Unit Price
$151.46000

Current price of CF004A is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team sales@vigor.vom.SG

Type Description
Series:Richco, CF
Package:Bag
Part Status:Active
Type:Wire Loom, Protective Hose
Type Attributes:Convoluted, Corrugated
Diameter - Inside:0.543" (13.79mm)
Diameter - Outside:0.787" (20.00mm)
Material:High Density Polyethylene (HDPE)
Color:Gray
Length:328' (100.00m)
Wall Thickness:-
Operating Temperature:-40°C ~ 93°C
Heat Protection:-
Abrasion Protection:-
Liquid Protection:-
Environment Protection:-
Features:-
Material Flammability Rating:-
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
Shipped from
HK warehouse
Expected Shipping Date
Nov 16 - Nov 20 2025
Enter Quantity
Pricing(USD)
Quantity Unit Price Ext. Price
1 $151.46000 $151.46
10 $136.31660 $1363.166
25 $121.17060 $3029.265
100 $113.59734 $11359.734
FPANF-29B.50

FPANF-29B.50

FIPLOCK, PA6 MOD, NW29, FINE, BL

AGCG.09BK250

AGCG.09BK250

SLEEVING 0.118" ID FBRGLASS 250'

FPDFF-07B.50

FPDFF-07B.50

FIPLOCK, PA12 MOD V0, NW07, FINE

RLR05C61R9FRR36

RLR05C61R9FRR36

ERL-05 61.9 1% T-1 RLR05C61R9FR

CF004A

CF004A

HOSE .542" ID HDPE 328' GRAY

T120R0UVC2

T120R0UVC2

CBL TIE LOCKING BLK 120LBS 1.27'

LK329E

LK329E

MECHANICAL LOCKOUT TAGOUT KIT OP

Top