CKC21X822GWGAC7800

Image is for reference,
please contact us to get the real picture

Part No :

CKC21X822GWGAC7800

Manufacturer
KEMET
Description
KC-LINK 2220 8.2NF 650VDC C0G
Catalog
Ceramic Capacitors
Shipped from
HK warehouse
Expected Shipping Date
Oct 06 - Oct 10 2025
DataSheet
CKC21X822GWGAC7800 PDF
Availability
0 pieces
Unit Price
$1.97924

Current price of CKC21X822GWGAC7800 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:*
Package:Tape & Reel (TR)
Part Status:Active
Capacitance:-
Tolerance:-
Voltage - Rated:-
Temperature Coefficient:-
Operating Temperature:-
Features:-
Ratings:-
Applications:-
Failure Rate:-
Mounting Type:-
Package / Case:-
Size / Dimension:-
Height - Seated (Max):-
Thickness (Max):-
Lead Spacing:-
Lead Style:-
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 0505J1502P70HQT

0505J1502P70HQT

CAP CER 2.7PF 150V C0G/NP0 0505
HOT 0805Y2500102JXR

0805Y2500102JXR

CAP CER 1000PF 250V X7R 0805
HOT C322C202K3G5TA7301

C322C202K3G5TA7301

CAP CER 2000PF 25V C0G/NP0 RAD
CKC21X822GWGAC7800

CKC21X822GWGAC7800

KC-LINK 2220 8.2NF 650VDC C0G

050R40-127B

050R40-127B

CABLE FFC 40POS 0.50MM 5"

R1S12-1505

R1S12-1505

DC DC CONVERTER 5V 1W

V28A6V5H200BL3

V28A6V5H200BL3

DC DC CONVERTER 6.5V 200W

Top