Part No :

MAX78615+LMU/A01

Manufacturer
Maxim Integrated
Description
IC ENERGY MEAS PROC LMU TQFN
Catalog
PMIC - Energy Metering
DataSheet
MAX78615+LMU/A01 PDF
Availability
2513 pieces
Unit Price
$0.00000

Current price of MAX78615+LMU/A01 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team sales@vigor.vom.SG

Type Description
Series:-
Package:Tray
Part Status:Discontinued at Digi-Key
Input Impedance:-
Measurement Error:-
Voltage - I/O High:2V
Voltage - I/O Low:0.8V
Current - Supply:5.6mA
Voltage - Supply:3.15 V ~ 3.45 V
Meter Type:Single Phase
Operating Temperature:-40°C ~ 85°C
Mounting Type:Surface Mount
Package / Case:24-WFQFN Exposed Pad
Supplier Device Package:24-TQFN (4x4)
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
Shipped from
HK warehouse
Expected Shipping Date
Nov 20 - Nov 24 2025
Enter Quantity
Pricing(USD)
Quantity Unit Price Ext. Price
LTC2946CDE

LTC2946CDE

IC SUPERVISOR

MCP3910-E/ML

MCP3910-E/ML

IC ENERGY METER FRONT 2CH 20-QFN

78M6610+PSU/C01

78M6610+PSU/C01

IC ENERGY MEASUREMENT 16TSSOP

929834-02-08-RK

929834-02-08-RK

CONN HEADER VERT 8POS 2.54MM

E3FA-DP26-F2

E3FA-DP26-F2

SENSOR REFLECTIVE 1M PNP

MAX4791EUK+T

MAX4791EUK+T

IC SWITCH 1X1 SOT23-5

MAX78615+LMU/A01

MAX78615+LMU/A01

IC ENERGY MEAS PROC LMU TQFN

Top