PDU3VN3H50

Image is for reference,
please contact us to get the real picture

Part No :

PDU3VN3H50

Manufacturer
Tripp Lite
Description
PDU 3-PHASE MONITORD 208V 12.6KW
Catalog
Power Distribution, Surge Protectors
DataSheet
PDU3VN3H50 PDF
Availability
0 pieces
Unit Price
$0.00000

Current price of PDU3VN3H50 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team sales@vigor.vom.SG

Type Description
Series:-
Package:Bulk
Part Status:Obsolete
Type:PDU (Power Distribution Unit)
Mounting Type:Rack, Vertical
Current - Max:35A
Region Utilized:-
Overload Protection:Circuit Breaker(s)
Connector - AC Input:CS8365C
Connector - AC Output:IEC 320-C13 (30), C19 (6)
Voltage - Input:208V
Housing Material:Steel
Media Lines Protected:-
AC Outlets:36
Energy:-
Cord Length:3' (0.92m)
Approval Agency:NOM, UL
Features:Load Meter
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
Shipped from
HK warehouse
Expected Shipping Date
Nov 13 - Nov 17 2025
Enter Quantity
Pricing(USD)
Quantity Unit Price Ext. Price
PDUMVR30NET

PDUMVR30NET

PDU SWITCHED 5-15/20R 24 OUTLET

2838186

2838186

SURGE PROTEC TERM BLOCK 24VDC

TLP61D

TLP61D

INTL SURGE PROT 6 SCHUKO OUTLET

GF3B6000EU-TAA

GF3B6000EU-TAA

6TB 5400 USB 3.0/ESATA TAA DRIVE

SVC75C3D27B2-125.000M

SVC75C3D27B2-125.000M

XTAL OSC VCXO 125.0000MHZ CMOS

WO-18X19

WO-18X19

WRENCH DBL OPEN 18X19MM

PDU3VN3H50

PDU3VN3H50

PDU 3-PHASE MONITORD 208V 12.6KW

Top