GMC21CGR75C100NTD

Image is for reference,
please contact us to get the real picture

Part No :

GMC21CGR75C100NTD

Manufacturer
CAL-CHIP ELECTRONICS INC.
Description
CAP0805 COG .75PF .25PF 100V
Catalog
Ceramic Capacitors
Shipped from
HK warehouse
Expected Shipping Date
Oct 21 - Oct 25 2025
DataSheet
GMC21CGR75C100NTD PDF
Availability
90000 pieces
Unit Price
$0.04000

Current price of GMC21CGR75C100NTD is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:GMC
Package:Tape & Reel (TR)
Part Status:Active
Capacitance:0.75 pF
Tolerance:±0.25pF
Voltage - Rated:100V
Temperature Coefficient:C0G, NP0
Operating Temperature:-55°C ~ 125°C
Features:-
Ratings:-
Applications:General Purpose
Failure Rate:-
Mounting Type:Surface Mount, MLCC
Package / Case:0805 (2012 Metric)
Size / Dimension:-
Height - Seated (Max):-
Thickness (Max):0.055" (1.40mm)
Lead Spacing:-
Lead Style:-
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 1812J1000561KCR

1812J1000561KCR

CAP CER 560PF 100V C0G/NP0 1812
HOT 2225J4K00821GCT

2225J4K00821GCT

CAP CER 820PF 4KV C0G/NP0 2225
HOT 1206J0500681GCT

1206J0500681GCT

CAP CER 680PF 50V C0G/NP0 1206
PWR263S-20-2R50F

PWR263S-20-2R50F

RES SMD 2.5 OHM 1% 20W D2PAK

1206J2000331KXT

1206J2000331KXT

CAP CER 330PF 200V X7R 1206

GMC21CGR75C100NTD

GMC21CGR75C100NTD

CAP0805 COG .75PF .25PF 100V

NGS-2B

NGS-2B

GROMMET BLACK SOLID 100' 11/64"

Top