1653230000

Image is for reference,
please contact us to get the real picture

Part No :

1653230000

Manufacturer
Weidmuller
Description
CONN HOOD CPLNG BOTTOM SZ3 PG21
Catalog
Heavy Duty Connectors - Housings, Hoods, Bases
Shipped from
HK warehouse
Expected Shipping Date
Oct 15 - Oct 19 2025
DataSheet
1653230000 PDF
Availability
15 pieces
Unit Price
$16.35000

Current price of 1653230000 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:RockStar®
Package:Bulk
Part Status:Active
Connector Type:Hood - Coupling
Style:Bottom Entry
Size:3
Lock Location:Locking Clip (1) on Hood Top
Thread Size:PG21
Size / Dimension:2.362" L x 1.693" W x 2.945" H (60.00mm x 43.00mm x 74.80mm)
Housing Color:Gray
Features:Cable to Cable
Ingress Protection:IP65 - Dust Tight, Water Resistant
Housing Material:Aluminum, Die Cast
Housing Finish:Powder Coated
Operating Temperature:-
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 2-1102107-2

2-1102107-2

CONN BASE BOTTOM ENTRY SZ1
HOT 19302161542

19302161542

HAN 16B-HMC-GS-R-M32
HOT H16BPR-TGH-M32-EMC-C

H16BPR-TGH-M32-EMC-C

CONN HOOD TOP ENTRY SZH16B M32
0805Y0500390GQT

0805Y0500390GQT

CAP CER 39PF 50V C0G/NP0 0805

1653230000

1653230000

CONN HOOD CPLNG BOTTOM SZ3 PG21

VI-JTX-EZ

VI-JTX-EZ

DC DC CONVERTER 5.2V 25W

VE-24H-MV-F4

VE-24H-MV-F4

DC DC CONVERTER 52V 150W

Top