0936012571

Image is for reference,
please contact us to get the real picture

Part No :

0936012571

Manufacturer
Woodhead - Molex
Description
BULKHEAD MOUNTING HOUSING 1 LEVE
Catalog
Heavy Duty Connectors - Housings, Hoods, Bases
Shipped from
HK warehouse
Expected Shipping Date
Oct 18 - Oct 22 2025
DataSheet
0936012571 PDF
Availability
24 pieces
Unit Price
$21.00000

Current price of 0936012571 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:GWconnect
Package:Bulk
Part Status:Active
Connector Type:Base - Panel Mount
Style:Bottom Entry
Size:16B
Lock Location:Locking Clip (1) on Base Bottom
Thread Size:-
Size / Dimension:4.547" L x 1.732" W x 1.161" H (115.50mm x 44.00mm x 29.50mm)
Housing Color:-
Features:-
Ingress Protection:IP66 - Dust Tight, Water Resistant
Housing Material:Aluminum Alloy, Die Cast
Housing Finish:Powder Coated
Operating Temperature:-40°C ~ 125°C
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 1212400000

1212400000

CONN BASE BOTTOM ENTRY SZ8
HOT 19620031440

19620031440

CONN HOOD TOP ENTRY SZ3A M20
HOT 19431060755

19431060755

HAN-ECO 6B CABLE TO CABLE HOOD,
EDH226M016A9BAA

EDH226M016A9BAA

CAP ALUM 22UF 20% 16V SMD

0936012571

0936012571

BULKHEAD MOUNTING HOUSING 1 LEVE

BFC238310274

BFC238310274

CAP FILM 0.27UF 5% 400VDC RADIAL

VE-JNM-CY-F1

VE-JNM-CY-F1

DC DC CONVERTER 10V 50W

Top