PMRBU

Image is for reference,
please contact us to get the real picture

Part No :

PMRBU

Manufacturer
Altech Corporation
Description
RECEPTACLEPNL MNT 15A125VAC IP54
Catalog
Power Entry Connectors - Inlets, Outlets, Modules
Shipped from
HK warehouse
Expected Shipping Date
Oct 17 - Oct 21 2025
DataSheet
PMRBU PDF
Availability
153 pieces
Unit Price
$11.62000

Current price of PMRBU is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:*
Package:Bulk
Part Status:Active
Connector Style:-
Connector Type:-
Current - IEC:-
Voltage - IEC:-
Current - UL:-
Voltage - UL:-
Filter Type:-
Accomodates a Fuse:-
Number of Positions:-
Mounting Type:-
Termination:-
Switch Features:-
Features:-
Fuse Holder, Drawer:-
Panel Cutout Dimensions:-
Panel Thickness:-
Material Flammability Rating:-
Ingress Protection:-
Approval Agency:-
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 1301470057

1301470057

PWR ENT RCPT NEMAL15-20 STR SCRW
HOT 5-6609941-0

5-6609941-0

PWR ENT MOD RCPT IEC320-C14 PNL
HOT 1301410045

1301410045

PWR ENT PLUG NEMAL7-15 STR SCRW
ADUM1285CRZ

ADUM1285CRZ

DGTL ISO 3000VRMS 2CH GP 8SOIC

2EZ190D5

2EZ190D5

DIODE ZENER 190V 2W DO204AL

PMRBU

PMRBU

RECEPTACLEPNL MNT 15A125VAC IP54

CN0967C22A55S6Y240

CN0967C22A55S6Y240

CONN RCPT FMALE 55POS CRIMP

Top