S2025NTP

Image is for reference,
please contact us to get the real picture

Part No :

S2025NTP

Manufacturer
Wickmann / Littelfuse
Description
SCR 200V 25A TO263
Catalog
Thyristors - SCRs
Shipped from
HK warehouse
Expected Shipping Date
Oct 11 - Oct 15 2025
DataSheet
S2025NTP PDF
Availability
0 pieces
Unit Price
$0.00000

Current price of S2025NTP is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:-
Package:Tube
Part Status:Obsolete
Voltage - Off State:200 V
Voltage - Gate Trigger (Vgt) (Max):1.5 V
Current - Gate Trigger (Igt) (Max):35 mA
Voltage - On State (Vtm) (Max):1.6 V
Current - On State (It (AV)) (Max):16 A
Current - On State (It (RMS)) (Max):25 A
Current - Hold (Ih) (Max):50 mA
Current - Off State (Max):10 µA
Current - Non Rep. Surge 50, 60Hz (Itsm):300A, 350A
SCR Type:Standard Recovery
Operating Temperature:-40°C ~ 125°C
Mounting Type:Surface Mount
Package / Case:TO-263-3, D²Pak (2 Leads + Tab), TO-263AB
Supplier Device Package:TO-263 (D2Pak)
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT S4006VS2

S4006VS2

SCR 400V 6A TO251
HOT S2S1RP

S2S1RP

SCR 200V 800MA DO214
HOT CR12CS-16B-T1#BH0

CR12CS-16B-T1#BH0

SCR 800V 18.8A TO263
0AFH0002XP

0AFH0002XP

FUSE HOLDER BLADE PNL MNT

CPPT7-HZ76P

CPPT7-HZ76P

OSC PROG TTL 5V 100PPM STBY

ET21MD1V3BE

ET21MD1V3BE

SWITCH TOGGLE DPDT 0.4VA 20V

S2025NTP

S2025NTP

SCR 200V 25A TO263

Top