VS-16TTS08STRLPBF

Image is for reference,
please contact us to get the real picture

Part No :

VS-16TTS08STRLPBF

Manufacturer
Vishay General Semiconductor – Diodes Division
Description
SCR 800V 16A TO263AB
Catalog
Thyristors - SCRs
Shipped from
HK warehouse
Expected Shipping Date
Oct 05 - Oct 09 2025
DataSheet
VS-16TTS08STRLPBF PDF
Availability
0 pieces
Unit Price
$0.00000

Current price of VS-16TTS08STRLPBF is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:-
Package:Tape & Reel (TR)Cut Tape (CT)
Part Status:Discontinued at Digi-Key
Voltage - Off State:800 V
Voltage - Gate Trigger (Vgt) (Max):2 V
Current - Gate Trigger (Igt) (Max):60 mA
Voltage - On State (Vtm) (Max):1.4 V
Current - On State (It (AV)) (Max):10 A
Current - On State (It (RMS)) (Max):16 A
Current - Hold (Ih) (Max):150 mA
Current - Off State (Max):10 mA
Current - Non Rep. Surge 50, 60Hz (Itsm):170A @ 50Hz
SCR Type:Standard Recovery
Operating Temperature:-40°C ~ 125°C
Mounting Type:Surface Mount
Package / Case:TO-263-3, D²Pak (2 Leads + Tab), TO-263AB
Supplier Device Package:TO-263AB (D²PAK)
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT S2010LS2

S2010LS2

SCR 200V 10A TO220
HOT CS220-16P

CS220-16P

SCR 1KV 16A TO220
HOT VS-25TTS16STRRPBF

VS-25TTS16STRRPBF

SCR 1.6KV 25A TO263AB
PD60-3-1260-CANOPEN

PD60-3-1260-CANOPEN

PANDRIVE NEMA24, 48V, 2.10NM

48236-000LF

48236-000LF

CONN SOCKET 22-26AWG CRIMP GOLD

304256

304256

AVK 35 TERMINAL BLOCK WHITE 600V

VS-16TTS08STRLPBF

VS-16TTS08STRLPBF

SCR 800V 16A TO263AB

Top