PDU3VN3L2120LV

Image is for reference,
please contact us to get the real picture

Part No :

PDU3VN3L2120LV

Manufacturer
Tripp Lite
Description
PDU 3-PHASE MONITORED 120V 5.7KW
Catalog
Power Distribution, Surge Protectors
DataSheet
PDU3VN3L2120LV PDF
Availability
0 pieces
Unit Price
$0.00000

Current price of PDU3VN3L2120LV is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team sales@vigor.vom.SG

Type Description
Series:-
Package:Bulk
Part Status:Obsolete
Type:PDU (Power Distribution Unit)
Mounting Type:Rack, Vertical
Current - Max:16A
Region Utilized:-
Overload Protection:Circuit Breaker(s)
Connector - AC Input:NEMA L21-20P
Connector - AC Output:NEMA 5-20R
Voltage - Input:208V
Housing Material:Steel
Media Lines Protected:-
AC Outlets:36
Energy:-
Cord Length:3' (0.92m)
Approval Agency:NOM, UL
Features:Load Meter
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
Shipped from
HK warehouse
Expected Shipping Date
Nov 15 - Nov 19 2025
Enter Quantity
Pricing(USD)
Quantity Unit Price Ext. Price
AVBAR6

AVBAR6

HOME THEATER ISOBAR SURGE 6 OUT

TLP51D

TLP51D

SURGE 5 SCHUKO OUTLETS GERMAN

P24E01M

P24E01M

IPDU SMARTZONE G5

1455C801BK

1455C801BK

BOX ALUM BLACK 3.15"L X 2.13"W

PDU3VN3L2120LV

PDU3VN3L2120LV

PDU 3-PHASE MONITORED 120V 5.7KW

654P2704C3T

654P2704C3T

XTAL OSC XO 27.0000MHZ LVPECL

25-060-22X

25-060-22X

25-060-22X=WILMAR O/U FREQUENCY

Top