MB4S

Image is for reference,
please contact us to get the real picture

Part No :

MB4S

Manufacturer
Sanyo Semiconductor/ON Semiconductor
Description
BRIDGE RECT 1P 400V 500MA 4SOIC
Catalog
Diodes - Bridge Rectifiers
Shipped from
HK warehouse
Expected Shipping Date
Oct 01 - Oct 05 2025
DataSheet
MB4S PDF
Availability
48977 pieces
Unit Price
$0.46000

Current price of MB4S is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:-
Package:Tape & Reel (TR)Cut Tape (CT)
Part Status:Active
Diode Type:Single Phase
Technology:Standard
Voltage - Peak Reverse (Max):400 V
Current - Average Rectified (Io):500 mA
Voltage - Forward (Vf) (Max) @ If:1 V @ 500 mA
Current - Reverse Leakage @ Vr:5 µA @ 400 V
Operating Temperature:-55°C ~ 150°C (TJ)
Mounting Type:Surface Mount
Package / Case:TO-269AA, 4-BESOP
Supplier Device Package:4-SOIC
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT B380S2A-SLIM

B380S2A-SLIM

1PH BRIDGE SO-DIL 800V 2.3A
HOT RC202

RC202

BRIDGE RECT GLASS 100V 2A RC-2
HOT B500D

B500D

1PH BRIDGE DIL 1000V 1A
4116R-2-563LF

4116R-2-563LF

RES ARRAY 15 RES 56K OHM 16DIP

MB4S

MB4S

BRIDGE RECT 1P 400V 500MA 4SOIC

UT07103PH01

UT07103PH01

CONN RCPT HSNG MALE 3POS PNL MT

S5KC15ANRC3GNNC

S5KC15ANRC3GNNC

15 KVA ONLINE UPS W/ 3 BAT (C)

Top